Thursday, May 27, 2010

Plumbing Project is Complete

The basement plumbing replacement project is now complete. Please feel free to inspect the job. Our contractor replaced all the plumbing in the basement with brand new copper lines. Tomorrow Friday they will come back to insulate the water lines.

Plumbing service is now back to normal.

Thank you for your patience.

Friday, May 21, 2010

Basement Plumbing Replacement Project

The project will replace 90% of existing old plumbing in the basement and will begin on Monday May 24th. Although the new water lines will be build parallel to the old lines, there will be the need for temporary water shutdowns that will last no more than 1 hour at a time.

Please have extra water handy in sinks, bathtubs and buckets to use as needed. The project will take all week and is expected to end on Sunday May 30th.

Thursday, May 13, 2010

Basement Recostruction and Improvements

On June 1st the basement reconstruction project will begin. Before this project starts, a number of plumbing improvements will be performed to eliminate some old pipes that are risky.

The entire basement will be reconstructed and the lockers will be replaced with storage rooms. The basement will fully and completely reconstructed with 24 proper storage rooms. A nice bicycle storage area will be created as well. The basement will be dry-walled, painted white and new vinyl floor will be installed.


All owners/renters must empty their lockers and remove their bicycles before May31st. The lockers must be left unlocked or the construction crew will have to cut the locks open. Items, bicycles left in the basement will be thrown away and will be removed at owners' expense.